Indore Metro Priority Corridor–2 Inaugurated
Union Minister Shri Manohar Lal and Madhya Pradesh Chief Minister Shri Mohan Yadav inaugurated the Indore Metro Priority Corridor–2. The new phase-I (Reach-II) spans approximately 11 km with 11 stations from Super Corridor-3 to Malviya Nagar Chauraha, built at a cost of ₹2,850 crore. This expansion brings the total Indore Metro network to 16 operational stations covering around 17 km.
Why It Matters
This is relevant for competitive exam candidates tracking infrastructure developments, government transport projects, and regional urban mobility expansions in India.
In Simple Words
Union Minister for Housing and Urban Affairs Shri Manohar Lal, joined by Madhya Pradesh Chief Minister Shri Mohan Yadav, inaugurated the Indore Metro Priority Corridor–2. This marks a major step forward for urban transport in Indore.
The newly opened phase-I (Reach-II) covers about 11 km and includes 11 stations running from Super Corridor-3 to Malviya Nagar Chauraha, built for roughly ₹2,850 crore. The overall Indore Metro network now reaches 16 operational stations over 17 km, with a total project cost of about ₹4,370 crore.
Key Points
- Indore Metro Priority Corridor–2 was inaugurated by Union Minister Shri Manohar Lal and Madhya Pradesh Chief Minister Shri Mohan Yadav.
- Minister of State for Housing and Urban Affairs Shri Tokhan Sahu was also present.
- The newly inaugurated phase-I (Reach-II) is approximately 11 km long.
- It comprises 11 stations starting from Super Corridor-3 to Malviya Nagar Chauraha.
- The estimated cost of this phase is ₹2,850 crore.
- Following this expansion, the Indore Metro network has 16 operational stations covering about 17 km.
- The cumulative project cost of the network is about ₹4,370 crore.
- The project was developed by the Madhya Pradesh Metro Rail Corporation Limited.
Exam Angle
A. Approximately 11 km long with 11 stations, developed at an estimated cost of ₹2,850 crore.
Source: Press Information Bureau